Date | Agenda/ Summary | Documents/ Meeting Materials |
Dec. 10 | Agenda Summary |
Codifying administrative practices and determinations related to bulk, coverage and placement: 1. Allowing porches to encroach 4 feet into the 25-foot setback (3.2.6.A.1(e)) 2. Requiring eaves of accessory buildings to be at least one foot from any property line (3.2.6.A.2(e)) 3. Allowing various types of mechanical equipment to be located in required yards (3.2.6.A.3(b)) 4. Allowing bay windows, decks and oriel windows to project into required setback (3.2.6.A.3(a)) Overview Memo Draft amendments |
Oct. 15 | Agenda Summary |
Large Media Screens Revised Concept |
Sept. 18 | Agenda Summary |
Large Media Screens Preliminary Concept |
July 9 | See website: Columbia Pike Area Neighborhoods Plan Implementation | |
June 25 | Summary | Columbia Pike Neighborhoods Plan Implementation See website: Columbia Pike Area Neighborhoods Plan Implementation |
May 22 | Agenda Summary |
Zoning Ordinance update: Phase IIB (minor policy updates): Review of preliminary scope. Preliminary Scope |
April 11 | Agenda Summary |
Meeting of ZOCO and the FBC Advisory Working Group. See website: Columbia Pike Area Neighborhoods Plan Implementation |
April 3 | Agenda Summary |
Meeting of ZOCO and the FBC Advisory Working Group See website: Columbia Pike Area Neighborhoods Plan Implementation |
March 12 | Agenda Summary |
Zoning Ordinance Reformat: 1.Zoning Ordinance reformat – public draft 2. Public comments Changes in RTA Draft |
March 5 | Agenda Summary |
Meeting of ZOCO and FBC Advisory Working Group. See website: Columbia Pike Area Neighborhoods Plan Implementation |
Feb. 19 | Agenda Summary |
Outdoor Cafes on Private Property |
Jan. 9 | Agenda Summary |
Meeting of ZOCO, FBC Advisory Working Group and Long Range Planning Committee of the Planning Commission.See website: Columbia Pike Area Neighborhoods Plan Implementation |
Jan. 3 | Agenda Summary |
Amendment to R-C Purpose Statement (Section 16A) |